Projexasia Limited was appointed as Main Contractor for the fit out project in April 2012.
The project include fitting out work; partitioning works, floor and wall finishes; fixtures and furniture; vertical blinds, logo, E&M services installation, door installation, etc. at Time Sqaure 1606 Tower 2.