The Hong Kong Football Association Limited
Main Contract Works (Design and Build)
Projexasia was appointed as Main Contractor for the design and build works of the Hong Kong Football Training Centre Phase 1 in Tseung Kwan O Stage 1 (TKO1) Landfill, in September 2016.
This unique project is the first of it's kind in Hong Kong, and will see 6 state of the art pitches delivered to the public and professional players.
3 pitches will be natural grass and 3 will be FIFA approved synthetic turf. Pitches are being lit by state of the art LED's and will be delivering a whopping 500lux to 4 of the pitches, enabling live broadcasting of the matches.
Furthermore the entire site is built on top of an existing landfill area, which is in turn all reclaimed land, making this a one of a kind development, requiring Projexasia's unique skills and once again demonstrating our ability to deliver a wide spectrum of projects.
Video: http://www.projexasia.com/PXA186.mp4